Preparation and brief project stage
NB the RIBA Plan of Work 2020 renamed this stage 'Preparation and briefing'.
The process for completing the design and construction of a building is often divided into stages. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments.
However, there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages actually include (see comparison of work stages), and so it is important that appointment documents make it clear specifically what activities fall within which stage, and what level of detail is required.
‘Preparation and brief’ is a new phrase coined by the Royal Institute of British Architects (RIBA) for their 2013 Plan of Work. This plan comprises eight work stages, and its new terminology, stage referencing system and lack of detail have generated some criticism.
- 0 - Strategic definition.
- 1 - Preparation and brief.
- 2 - Concept design.
- 3 - Developed design.
- 4 - Technical design.
- 5 - Construction.
- 6 - Handover and close out.
- 7 - In use.
The preparation and brief stage involves:
- Developing an initial project brief. This may include; considering feedback from previous projects, defining overall spatial requirements, carrying out surveys and quantifying the budget.
- Carrying out feasibility studies.
- Undertaking a project risk assessment, including; planning risks, programme and procurement strategy.
- Assembling the project team and defining their roles and responsibilities.
This preparatory work enables the design process to begin in the next stage ‘concept design’.
The RIBA suggest that this new stage 1 merges the ‘residual’ tasks from the former Stage A ‘Appraisal’ and Stage B ‘Design Brief’.
[edit] Related articles on Designing Buildings Wiki
- Appointing consultants.
- Briefing documents.
- Comparison of work stages.
- Designing Buildings Wiki Project plans.
- Design responsibility matrix.
- Feasibility studies.
- Project brief.
- RIBA Plan of Work.
- Risk assessment.
[edit] External references
Featured articles and news
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
ECA progress on Welsh Recharging Electrical Skills Charter
Working hard to make progress on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.